PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing copper piping at the 4th floor Facing West'.jpg Installing copper piping at the 4th floor Facing West.jpg Installing Stair -3 Facing West.jpg Metal furring the Elev. 1,2,3 shear walls at the 4th floor Facing North-East.jpg Metal furring the Elev. 1,2,3 shear walls at the 4th floor Facing North.jpg
Previous page Metal furring the Elev. 1,2,3 shear walls at the 4th floor Facing North
Metal furring the Elev. 1,2,3 shear walls at the 4th floor Facing North